George Street/Hilliard Street Intersection Improvements and Rotary Trail Lighting Implementation

Share George Street/Hilliard Street Intersection Improvements and Rotary Trail Lighting Implementation on Facebook Share George Street/Hilliard Street Intersection Improvements and Rotary Trail Lighting Implementation on Twitter Share George Street/Hilliard Street Intersection Improvements and Rotary Trail Lighting Implementation on Linkedin Email George Street/Hilliard Street Intersection Improvements and Rotary Trail Lighting Implementation link
Intersection of George Street and Hilliard Street

What's Happening:
The City of Peterborough is undertaking a signalized intersection improvement project for the intersection of George Street and Hilliard Street, along with implementation of trail lighting and various other amenities along approximately 1.35 kilometres of trail leading from the George Street/Hilliard Street intersection to Bethune Street. The trail lighting scope included in this project is being completed with support from the Federal Active Transportation Fund, which is designed to enhance active transportation networks.

The George Street/Hilliard Street intersection improvements will include:

  • Realignment of the southbound approach to the intersection from Water Street/George Street.
  • Installation of traffic signals to accommodate trail users to cross the intersection with dedicated crossings.
  • Improvements to the Rotary Greenway Trail approaches to the intersection.
  • Improvements to accessibility for the intersection including audible pedestrian push buttons and tactile approaches to the intersection.

The Rotary Greenway Trail lighting implementation between Bethune Street and Hilliard Street will improve the trail for users of all ages and abilities, making the trail a higher functioning and more efficient key north-south crosstown route. The lighting implementation will improve a key trail link between downtown, surrounding neighbourhoods, a secondary school and Trent University. Also included in this project will be trail pavement markings, and additional signage on the trail throughout the project area.


Schedule:
This project is planned to be constructed entirely in 2025, with utility relocations occurring in 2024.
Please note that the scheduling details outlined above are only estimates, pending budget approvals and could be subject to change.


How can you be heard?
As part of the project process, we are collecting feedback from the community to ensure the project is meeting the community's needs. We encourage you to provide your input and feedback through the Questions section found at the bottom of this page, along with input we are seeking on locations of various amenities along the trail using the Map tool. Your feedback is valuable in ensuring the improvements are suited to the needs of the community. Please know that we value your feedback, and though we will review and consider all input we receive, changes to the project based on community input will only be made where deemed feasible by the project team.


What's Next?
All input and feedback will be reviewed and considered by the project team and incorporated into the detailed design if possible.


Updates:

August 23, 2024: Please note that a draft of the proposed configuration for the intersection of George Street and Hilliard Street has been uploaded to the "Documents" section on this page in a downloadable PDF drawing format. The community consultation period has also been extended to September 6th to allow for additional time to review and provide feedback on the proposed draft configuration. If you require an alternate format of the proposed configuration, please reach out to the Project Team for accommodations.

What's Happening:
The City of Peterborough is undertaking a signalized intersection improvement project for the intersection of George Street and Hilliard Street, along with implementation of trail lighting and various other amenities along approximately 1.35 kilometres of trail leading from the George Street/Hilliard Street intersection to Bethune Street. The trail lighting scope included in this project is being completed with support from the Federal Active Transportation Fund, which is designed to enhance active transportation networks.

The George Street/Hilliard Street intersection improvements will include:

  • Realignment of the southbound approach to the intersection from Water Street/George Street.
  • Installation of traffic signals to accommodate trail users to cross the intersection with dedicated crossings.
  • Improvements to the Rotary Greenway Trail approaches to the intersection.
  • Improvements to accessibility for the intersection including audible pedestrian push buttons and tactile approaches to the intersection.

The Rotary Greenway Trail lighting implementation between Bethune Street and Hilliard Street will improve the trail for users of all ages and abilities, making the trail a higher functioning and more efficient key north-south crosstown route. The lighting implementation will improve a key trail link between downtown, surrounding neighbourhoods, a secondary school and Trent University. Also included in this project will be trail pavement markings, and additional signage on the trail throughout the project area.


Schedule:
This project is planned to be constructed entirely in 2025, with utility relocations occurring in 2024.
Please note that the scheduling details outlined above are only estimates, pending budget approvals and could be subject to change.


How can you be heard?
As part of the project process, we are collecting feedback from the community to ensure the project is meeting the community's needs. We encourage you to provide your input and feedback through the Questions section found at the bottom of this page, along with input we are seeking on locations of various amenities along the trail using the Map tool. Your feedback is valuable in ensuring the improvements are suited to the needs of the community. Please know that we value your feedback, and though we will review and consider all input we receive, changes to the project based on community input will only be made where deemed feasible by the project team.


What's Next?
All input and feedback will be reviewed and considered by the project team and incorporated into the detailed design if possible.


Updates:

August 23, 2024: Please note that a draft of the proposed configuration for the intersection of George Street and Hilliard Street has been uploaded to the "Documents" section on this page in a downloadable PDF drawing format. The community consultation period has also been extended to September 6th to allow for additional time to review and provide feedback on the proposed draft configuration. If you require an alternate format of the proposed configuration, please reach out to the Project Team for accommodations.

Share Suggest Trail Rest Area Locations on Facebook Share Suggest Trail Rest Area Locations on Twitter Share Suggest Trail Rest Area Locations on Linkedin Email Suggest Trail Rest Area Locations link

Suggest Trail Rest Area Locations

about 2 months

We want your input on the placement and locations of rest areas. Rest areas along the trail will typically include benches and open area for mobility aides. Please use this tool if you would like to suggest locations for rest areas along the Rotary trail. Use the Add Pin button (plus symbol) on the left side menu pin a suggested location to the map. You are also encouraged to provide input on any specific features you would like to see implemented at the rest areas using the "Questions" feature on the main project page.

Page last updated: 23 Aug 2024, 02:25 PM